{"id":13042,"date":"2023-05-11T19:00:30","date_gmt":"2023-05-11T19:00:30","guid":{"rendered":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/?post_type=case_study&#038;p=13042"},"modified":"2025-09-23T13:31:45","modified_gmt":"2025-09-23T13:31:45","slug":"assembly-case-study","status":"publish","type":"case_study","link":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/","title":{"rendered":"Assembly case study"},"content":{"rendered":"<div class=\"gb-container gb-container-ae29c3ac alignfull\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-8c974040\"><div class=\"gb-inside-container\"><\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-47735803 case-study-hero-title alignfull\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-e10a4322\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-3b76379a\">\n<div class=\"gb-grid-column gb-grid-column-7e948fbf\"><div class=\"gb-container gb-container-7e948fbf\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-fdbbf8be gb-headline-text\">Assembly Case Study<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-5578b55a gb-headline-text\">Same Speed, 90% Less Tooling and TWO Different Autoinjectors on One Machine<\/p>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-97fe3f53\"><div class=\"gb-container gb-container-97fe3f53\"><div class=\"gb-inside-container\"><\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-0c2b60f0 alignfull\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-4b2bd704\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-9a4dc16b\">\n<div class=\"gb-grid-column gb-grid-column-ca0b8df6\"><div class=\"gb-container gb-container-ca0b8df6 case-study-sidebar\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-631b9ec1 gb-headline-text sidebar-item\" data-title=\"customer-requirements\">Customer requirements<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-6fa4ce42 gb-headline-text sidebar-item\" data-title=\"client-demo\">Client demo in action<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-9e783f91 gb-headline-text sidebar-item\" data-title=\"gentle-for-critical-processes\">Gentle for critical processes<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-13a06e7f gb-headline-text sidebar-item\" data-title=\"fast-for-non-critical-processes\">Fast for non-critical processes<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-918c872d gb-headline-text sidebar-item\" data-title=\"the-results\">The results<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-e5e443ea segment-button-wrp\">\n\n<a class=\"gb-button gb-button-d2fa4c4f gb-button-text atsls-btn\" href=\"#\" id=\"open-case-study-contact-form-modal\">Talk To an Expert<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-eb87a537\"><div class=\"gb-container gb-container-eb87a537 case-study-content-wrp\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-d9f23f70 gb-headline-text\">A common assumption about assembly technology is that for it to go fast, core processes must be altered, sped up, or be rendered with more force. This was exactly what a multinational pharmaceutical firm believed when they were looking for an innovative high-speed assembly solution for their new autoinjector lines.<\/p>\n\n\n<div class=\"gb-container gb-container-92e3bcac testimonial-section\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-05fcb54b gb-headline-text\">\u201cSAME SPEED. 90% Less tooling. zero compromise.\u201d<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-75efbcc0 gb-headline-text\">A client approached ATS to see if there was a better way to assemble autoinjectors faster and more efficiently. They wanted speed, flexibility, and performance all wrapped into one. They wanted their core processes to be respected. An they wanted to run two different autoinjectors on the same machine.<\/p>\n\n<\/div><\/div>\n\n\n<p class=\"gb-headline gb-headline-da97c299 gb-headline-text section-title\" data-title=\"customer-requirements\">CUSTOMER REQUIREMENTS<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-9a397239 gb-headline-text\">Our client was a medical device manufacturer that already had high volume assembly lines operating at 320 PPM for their autoinjector products. Their conventional, custom-built machines were very large, with 20 tools. Each assembly line also had pre- and post-quality inspection stations. Each quality station had 10 additional tools per station for a total of 40 tools on 3 stations.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-3d7d11af gb-headline-text\">The manufacturer was searching for an alternative to their current single purpose engineered-to-order assembly line.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-d2115f4c gb-headline-text\">Their challenge was to reduce machine footprints while keeping the core process running at 320 PPM. Additionally, was there a flexible technology that could produce two different products on the same assembly line?<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-8e3f5f0d gb-headline-text\">When we proposed that the digital assembly platform called SymphoniTM could reduce the current assembly machine from 20 to 4 tooling for the insertion process and eliminate two quality control stations by doing the quality inspection using the same 4 assembly tools, the client thought we were missing something. They were concerned that we would apply too much force on the product, or alter the core process, or not be able to monitor every critical stage of the assembly process. Our engineers designed touch tooling and mapped out the sequence of operations on a Symphoni off-line simulation tool called Dynamic\u2122. The tooling and operational sequence were then integrated into a module on a Symphoni demo machine.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-7e2a47e4 gb-headline-text\">The client was invited to the ATS Innovation Center to run the proof of principle.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-c7312a51 gb-headline-text\">With 4-UP tools in one station versus 40-UP tools on three stations on their current assembly line, Symphoni achieved the same insertion rate of 320 PPM while doing the pre- and post-inspection. Not only did Symphoni meet all the client\u2019s objectives, but the client was also pleasantly surprised by the precision and gentleness of the insertion process when they watched the high-speed video. Overall, Symphoni reduced floor space by over 50% and eliminated 90% of tooling.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-275f138e gb-headline-text\">In other words, we demonstrated that our standardized, modular, pre-engineered, pre-verified, digital assembly platform is unmatched in performance, quality, footprint, and flexibility compared to conventional assembly equipment.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-f276cf0c gb-headline-text\">Overall, the Symphoni system achieved the following:<\/p>\n\n\n\n<figure class=\"gb-block-image gb-block-image-3c777769\"><img decoding=\"async\" loading=\"lazy\" width=\"1666\" height=\"1158\" class=\"gb-image gb-image-3c777769\" src=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-27.jpg\" alt=\"\" title=\"image-27\" srcset=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-27.jpg 1666w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-27.jpg?resize=300,209 300w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-27.jpg?resize=768,534 768w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-27.jpg?resize=1024,712 1024w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-27.jpg?resize=1536,1068 1536w\" sizes=\"auto, (max-width: 1666px) 100vw, 1666px\" \/><\/figure>\n\n\n<div class=\"gb-container gb-container-b4352d50\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-399c9f73\">\n<div class=\"gb-grid-column gb-grid-column-17e9862e\"><div class=\"gb-container gb-container-17e9862e\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-99055743 gb-headline-text section-title\" data-title=\"client-demo\">Client Demo In Action<\/p>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-fa9d967b\"><div class=\"gb-container gb-container-fa9d967b\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-f40579b4 gb-headline-text\">(320 PPM, 1 OF 4 Tooling at 750 ms)<\/p>\n\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n\n\n<figure class=\"wp-block-video\"><video height=\"1080\" style=\"aspect-ratio: 1920 \/ 1080;\" width=\"1920\" controls src=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/CNC-fast_Mute.mp4\"><\/video><\/figure>\n\n\n\n<p class=\"gb-headline gb-headline-35e67691 gb-headline-text\">The high-speed camera captures the insertion that is otherwise difficult to see when the machine operates at 320 PPM. As you can see in the grey video, Symphoni performed the same core work at the same speeds and force as the existing equipment, while being gentle on the components.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-f6b6e2df gb-headline-text\">Reviewed another way, the Waveform Signature Analysis shows 50 runs on the demo unit, demonstrating that Symphoni does the same work at the same rate, respecting critical processes, but using fewer tools.<\/p>\n\n\n\n<figure class=\"gb-block-image gb-block-image-4fd82cab\"><img decoding=\"async\" loading=\"lazy\" width=\"1666\" height=\"896\" class=\"gb-image gb-image-4fd82cab\" src=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-28.jpg\" alt=\"\" title=\"image-28\" srcset=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-28.jpg 1666w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-28.jpg?resize=300,161 300w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-28.jpg?resize=768,413 768w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-28.jpg?resize=1024,551 1024w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-28.jpg?resize=1536,826 1536w\" sizes=\"auto, (max-width: 1666px) 100vw, 1666px\" \/><\/figure>\n\n\n\n<p class=\"gb-headline gb-headline-abc89601 gb-headline-text\">From the data overlaid, it is evident that there is minimal variation from one run to the next. We could clearly identify and monitor each of the interactions that the pre-filled syringes have with the injector body.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-2cdf8b1c gb-headline-text\">Furthermore, the next four (4) images capture and clearly identify the failure mode waveforms:<\/p>\n\n\n\n<figure class=\"gb-block-image gb-block-image-4b248ef9\"><img decoding=\"async\" loading=\"lazy\" width=\"1666\" height=\"1160\" class=\"gb-image gb-image-4b248ef9\" src=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-29.jpg\" alt=\"\" title=\"image-29\" srcset=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-29.jpg 1666w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-29.jpg?resize=300,209 300w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-29.jpg?resize=768,535 768w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-29.jpg?resize=1024,713 1024w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-29.jpg?resize=1536,1069 1536w\" sizes=\"auto, (max-width: 1666px) 100vw, 1666px\" \/><\/figure>\n\n\n\n<p class=\"gb-headline gb-headline-d71ba8c3 gb-headline-text section-title\" data-title=\"gentle-for-critical-processes\">GENTLE FOR CRITICAL PROCESSES AND PART HANDLING<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-ebb354be gb-headline-text\">The core principle of Symphoni is efficiency. We do not change process times or procedures associated with any critical operation. The demo showcases and highlights Symphoni\u2019s most important feature: efficiency. We adopt the lean methodology in our technology and use value stream mapping at the millisecond level to allow the system to go as slow as it needs for critical processes, and as fast as it can for non-value-added processes.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-9ae43ce6 gb-headline-text\">In this project, we monitor force and distance to identify any quality failures, just as with a conventional assembly line.<\/p>\n\n\n\n<figure class=\"gb-block-image gb-block-image-a0b84dee\"><img decoding=\"async\" loading=\"lazy\" width=\"1666\" height=\"974\" class=\"gb-image gb-image-a0b84dee\" src=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-27-1.jpg\" alt=\"\" title=\"image-27-1\" srcset=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-27-1.jpg 1666w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-27-1.jpg?resize=300,175 300w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-27-1.jpg?resize=768,449 768w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-27-1.jpg?resize=1024,599 1024w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/image-27-1.jpg?resize=1536,898 1536w\" sizes=\"auto, (max-width: 1666px) 100vw, 1666px\" \/><\/figure>\n\n\n\n<p class=\"gb-headline gb-headline-ff4482dc gb-headline-text section-title\" data-title=\"fast-for-non-critical-processes\">FAST FOR NON-CRITICAL PROCESSES<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-140812cc gb-headline-text\">The client\u2019s conventional equipment performed its critical functions at 38.5% of the total cycle time. The remainder of the total cycle time (800 milliseconds, or 61.5%) is wasted in preparation. This is where the machine is getting itself into place, preparing for critical process work, and getting everything out of the way to start the next cycle. These steps are necessary\u2014but at more than half of the total cycle time, they make the machine inefficient.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-09bda5fc gb-headline-text\">Symphoni\u2019s efficient methodology preserved valuable time in the non-valuable processes. While taking the same 500 milliseconds to do the critical process work, we eliminated 550 milliseconds of wasted motion, therefore changing the ratio to 67.7% of total cycle time devoted to critical motion. We call the remaining 32.3% \u2018non-value-added\u2019 processes. This flipped ratio is why Symphoni can go fast and still be gentle on parts. The synchronous motions are calm to allow the machine to take all the time it needs for the important processes like syringe insertions and ultrasonic welding.<\/p>\n\n\n\n<figure class=\"gb-block-image gb-block-image-e5a03689\"><img decoding=\"async\" loading=\"lazy\" width=\"1666\" height=\"988\" class=\"gb-image gb-image-e5a03689\" src=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/img-10.jpg\" alt=\"\" title=\"img-10\" srcset=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/img-10.jpg 1666w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/img-10.jpg?resize=300,178 300w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/img-10.jpg?resize=768,455 768w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/img-10.jpg?resize=1024,607 1024w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/img-10.jpg?resize=1536,911 1536w\" sizes=\"auto, (max-width: 1666px) 100vw, 1666px\" \/><\/figure>\n\n\n\n<p class=\"gb-headline gb-headline-ddf5f871 gb-headline-text section-title\" data-title=\"the-results\">THE RESULTS<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-85733c52 gb-headline-text\">The results of Symphoni when benchmarked against the client\u2019s existing conventional equipment is compelling.<\/p>\n\n\n\n<figure class=\"gb-block-image gb-block-image-8bda428b\"><img decoding=\"async\" loading=\"lazy\" width=\"1666\" height=\"774\" class=\"gb-image gb-image-8bda428b\" src=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/img-11.jpg\" alt=\"\" title=\"img-11\" srcset=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/img-11.jpg 1666w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/img-11.jpg?resize=300,139 300w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/img-11.jpg?resize=768,357 768w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/img-11.jpg?resize=1024,476 1024w, https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/05\/img-11.jpg?resize=1536,714 1536w\" sizes=\"auto, (max-width: 1666px) 100vw, 1666px\" \/><\/figure>\n\n\n\n<p class=\"gb-headline gb-headline-6a4751c3 gb-headline-text\">The value-added time of 500 milliseconds is critical and sacred\u2014no different than the conventional solution\u2014but the existing line had two quality check stations for a total of 3250 milliseconds of waste time compared to Symphoni\u2019s 250 milliseconds. Between the quality check stations and 20-UP tooling for assembly, the conventional lines had 40 tools doing the same work that Symphoni can do with four (4) tools.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-f3860d75 gb-headline-text\">The outcomes were clear, powerful, and\u2014from the client\u2019s perspective\u2014groundbreaking. Symphoni dramatically reduced footprint by more than 50%, reduced tooling by over 90% and increased quality without sacrificing performance.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-09889177 gb-headline-text\">The client\u2019s goal to run two different autoinjectors on the same machine was achieved.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-83dac14e gb-headline-text\">The client\u2019s only remaining question was: \u2018How does Symphoni achieve such performance at assembling autoinjectors while retaining quality and flexibility?\u2019<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-c5a47c06 gb-headline-text\">The answer is multifaceted\u2014there is no single element that allows Symphoni to do what it does. We started from first principles and devised a machine that zeroes in on precisely what is necessary while ruthlessly cutting out what is not.<\/p>\n\n\n<div class=\"gb-container gb-container-59ae61f1\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-5d3d9d7c gb-headline-text\">Symphoni consists, in part, of the following:<\/p>\n\n\n\n<ul style=\"color:#454545;font-size:18px\" class=\"wp-block-list has-text-color\">\n<li>A combination of patented (\u201cRapid Speed Matching\u201d) RSM Technology\u00ae that enables tight coordination of integrated, high-speed, digital, multi-axis robotics we call RMS Arms,<\/li>\n\n\n\n<li>Value stream mapping that removes waste,<\/li>\n\n\n\n<li>Compact, modular construction and digitally configurable synchronous operation,<\/li>\n\n\n\n<li>A decentralized, distributed control system, with each axis of motion controlled by a locally embedded copy of the Symphoni operating kernel,<\/li>\n\n\n\n<li>Digitally configurable, friction-free orientation of incoming par<\/li>\n\n\n\n<li>Highly precise motion control, with each axis digitally adjustable via the HMI in 0.01 mm increments,<\/li>\n\n\n\n<li>End-to-end digital awareness, with the status and position of each system device verified 200 times per second by self-diagnostics,<\/li>\n\n\n\n<li>The electromagnetic transport of SuperTrak CONVEYANCE\u2122, a smart technology with individually controlled shuttles allowing increased throughput without an increased footprint, resulting in less complex and more adaptable automation systems.<\/li>\n<\/ul>\n\n\n\n<p class=\"gb-headline gb-headline-22f37955 gb-headline-text\">Symphoni, with its high speed and high flexibility, provides the lowest total cost of ownership. It is a depreciable asset that can be retooled or reconfigured for different products and processes, thus adding flexibility to the business.<\/p>\n\n<\/div><\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-540083d9 alignfull\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-8519a293\">\n<div class=\"gb-grid-column gb-grid-column-c397222b\"><div class=\"gb-container gb-container-c397222b\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-d1e516a8 gb-headline-text\">Learn More About the Potential of High-Speed Digital Automated Assembly<\/h2>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-ce2c7be5\">\n\n<a class=\"gb-button gb-button-fc3d0119 gb-button-text atsls-btn atsls-modal-btn\" href=\"#\" data-id=\"atsls-modal-medium\">CONTACT US<\/a>\n\n<\/div>\n\n<div class=\"gb-button-wrapper gb-button-wrapper-069fbd3e\">\n\n<a class=\"gb-button gb-button-97bdc145 gb-button-text atsls-hover-btn atsls-modal-btn atsls-btn\" href=\"#\" data-id=\"atsls-modal-medium\">WATCH VIDEO<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-00949ae9\"><div class=\"gb-container gb-container-00949ae9\"><div class=\"gb-inside-container\"><\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-c4f2ffb8 atsls-modal atsls-modal-medium alignfull\" data-id=\"atsls-modal-medium\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\nhttps:\/\/youtu.be\/p06Q1xBaBgY\n<\/div><\/figure>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-5cd5be13\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-13a1557b gb-headline-text\">Resources<\/p>\n\n\n<div class=\"gb-grid-wrapper gb-grid-wrapper-47d7d9d2 atsls-resources-cards\">\n<div class=\"gb-grid-column gb-grid-column-c4f92cad gb-grid-column-resource\"><div class=\"gb-container gb-container-c4f92cad atsls-resource-item gb-container-resource\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-8dc8a251 image-wrapper\"><div class=\"gb-inside-container\"><\/div><\/div>\n\n<div class=\"gb-container gb-container-507b9cb3\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-a151da7b gb-headline-text gb-headline-paragraph-global\">BROCHURE<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-b5bf5a25 gb-headline-text\">Your Pharma Projects, Our Proven Automation Solutions<\/h3>\n\n\n\n<p class=\"gb-headline gb-headline-0b3bbc24 gb-headline-text gb-headline-paragraph-global\">Are you a pharma manufacturer? Learn about how we can help you with your project<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-button-wrapper gb-button-wrapper-dd10af9a segment-button-wrp\">\n\n<a class=\"gb-button gb-button-79bca1a7 gb-button-text atsls-btn\" href=\"https:\/\/cdn1-originals.webdamdb.com\/13831_125483586?cache=1636381140&amp;response-content-disposition=inline;filename=ATS-Jetwing1.pdf&amp;response-content-type=application\/pdf&amp;Policy=eyJTdGF0ZW1lbnQiOlt7IlJlc291cmNlIjoiaHR0cCo6Ly9jZG4xLW9yaWdpbmFscy53ZWJkYW1kYi5jb20vMTM4MzFfMTI1NDgzNTg2P2NhY2hlPTE2MzYzODExNDAmcmVzcG9uc2UtY29udGVudC1kaXNwb3NpdGlvbj1pbmxpbmU7ZmlsZW5hbWU9QVRTLUpldHdpbmcxLnBkZiZyZXNwb25zZS1jb250ZW50LXR5cGU9YXBwbGljYXRpb24vcGRmIiwiQ29uZGl0aW9uIjp7IkRhdGVMZXNzVGhhbiI6eyJBV1M6RXBvY2hUaW1lIjoyMTQ3NDE0NDAwfX19XX0_&amp;Signature=VM5h78gZPsnlbDj1p8pQrQbTDOiOPhZkrrB8LC~VXdwSw-kK3nwAG7hpgipWaBfMszEo9gHAECfoxwl4amqFtRVz-ZkrWkzXK1mNLmKxTufCwc6caJSffD8IVZ2D-F705mzWq8iAV7A5OMcj5ya8hK6FUWtcFkPjOd6FNlV4q~V~fF-URJ42Zi8PKVUNjkegzmgFwXSanDYcgaxBvediVOSbILL7ruhbHS9~71STMew647BpUf53sDTPqigmmY-1Zkqs3cvhxyPM5FTE5SXNzVfmyyPFQgvM7v6T4wNy-5iL-HdqJDPTaH3N31u-8VP~z8mgJf56NXH2l7AIP6N3lQ__&amp;Key-Pair-Id=APKAI2ASI2IOLRFF2RHA\" target=\"_blank\" rel=\"noopener noreferrer\">DOWNLOAD<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-cf3baa69 gb-grid-column-resource\"><div class=\"gb-container gb-container-cf3baa69 atsls-resource-item gb-container-resource\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-1c557d88 image-wrapper\"><div class=\"gb-inside-container\"><\/div><\/div>\n\n<div class=\"gb-container gb-container-b18031bd\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-1bf653a0 gb-headline-text gb-headline-paragraph-global\">BROCHURE<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-166c28f5 gb-headline-text\">Your Medtech Projects, Our Proven Automation Solutions<\/h3>\n\n\n\n<p class=\"gb-headline gb-headline-e1d2d3d6 gb-headline-text gb-headline-paragraph-global\">Are you a medical device or diagnostic manufacturer?Learn about how we can help you with your project<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-button-wrapper gb-button-wrapper-2ce35809 segment-button-wrp\">\n\n<a class=\"gb-button gb-button-e36a706d gb-button-text atsls-btn\" href=\"https:\/\/cdn1-originals.webdamdb.com\/13831_125483713?cache=1636381437&amp;response-content-disposition=inline;filename=ATS-Clearliner-1000-English.pdf&amp;response-content-type=application\/pdf&amp;Policy=eyJTdGF0ZW1lbnQiOlt7IlJlc291cmNlIjoiaHR0cCo6Ly9jZG4xLW9yaWdpbmFscy53ZWJkYW1kYi5jb20vMTM4MzFfMTI1NDgzNzEzP2NhY2hlPTE2MzYzODE0MzcmcmVzcG9uc2UtY29udGVudC1kaXNwb3NpdGlvbj1pbmxpbmU7ZmlsZW5hbWU9QVRTLUNsZWFybGluZXItMTAwMC1FbmdsaXNoLnBkZiZyZXNwb25zZS1jb250ZW50LXR5cGU9YXBwbGljYXRpb24vcGRmIiwiQ29uZGl0aW9uIjp7IkRhdGVMZXNzVGhhbiI6eyJBV1M6RXBvY2hUaW1lIjoyMTQ3NDE0NDAwfX19XX0_&amp;Signature=OFQKWbk7g4pbpntE-ro0NGNj41rymdyusWyFIVbwFMfwFy9ItB--J3hg~zbCY9tcP5OlNUuLm~vJofIQgnfPPc9za7rsTfiyl78QDFQgAgS9GZngrqDSLu7pW00EPDnYZsfCB6s9Cml-4iIuS046Q~KXGSS2jM1yMk3oTr8LUcPUtxyhP901QnQW0c3zE0S-4IYfhpPo2n8vlcFflx355y0p79~V8PHK2WYGS-Mm3TmVbKncsbdoBbWQFCsigHcO3M9yXsHph77Vq87DAjzQaAK5LIlLc0zkquSgxcbn58GhuPbAxcgDo38RePUtQBiZ5Eb6-kPe4~0O3ijGHWfodQ__&amp;Key-Pair-Id=APKAI2ASI2IOLRFF2RHA\" target=\"_blank\" rel=\"noopener noreferrer\">DOWNLOAD<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-084dd772 gb-grid-column-resource\"><div class=\"gb-container gb-container-084dd772 atsls-resource-item gb-container-resource\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-f293cef1 image-wrapper\"><div class=\"gb-inside-container\"><\/div><\/div>\n\n<div class=\"gb-container gb-container-1a541de2\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-d4e31261 gb-headline-text gb-headline-paragraph-global\">Fact Sheet<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-f239a920 gb-headline-text\">Standard Autoinjector Manufacturing System<\/h3>\n\n\n\n<p class=\"gb-headline gb-headline-af22688c gb-headline-text gb-headline-paragraph-global\">Pre-engineered for lower design costs and faster delivery; suitable for any common three-piece autoinjector<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-button-wrapper gb-button-wrapper-391ffad6 segment-button-wrp\">\n\n<a class=\"gb-button gb-button-6c92f111 gb-button-text atsls-btn\" href=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/2022\/12\/23\/5-ways-pharmaceutical-manufacturerers-can-improve-productivity-and-quality\/\" target=\"_blank\" rel=\"noopener noreferrer\">Download<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-7e8c2302 atsls-modal atsls-modal-medium alignfull\" data-id=\"atsls-modal-medium\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-63a91292 gb-headline-text\">GET IN TOUCH<\/h2>\n\n\n\n<p>Briefly tell us about your automation needs and we\u2019ll get back to you.<\/p>\n\n\n\n\n<!-- iframe plugin v.5.2 wordpress.org\/plugins\/iframe\/ -->\n<iframe loading=\"lazy\" data-cookieconsent=\"ignore\" id=\"pardot-iframe\" style=\"border: 0;\" src=\"https:\/\/go.atsautomation.com\/l\/651873\/2023-04-05\/h5mk32?Source_Page=assembly-case-study\" width=\"100%\" frameborder=\"0\" height=\"500\" scrolling=\"yes\" class=\"iframe-class\"><\/iframe>\n<script type=\"text\/javascript\">\nvar pardot_iframe= document.getElementById('pardot-iframe');\npardot_iframe.src = pardot_iframe.src + '&' + window.location.search.substr(1);\n<\/script>\n\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Same Speed, 90% Less Tooling and TWO Different Autoinjectors on One Machine<\/p>\n","protected":false},"featured_media":15025,"template":"","case_study_category":[],"case_study_tag":[],"resource_category":[],"class_list":["post-13042","case_study","type-case_study","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.8 (Yoast SEO v26.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Assembly case study - ATS Life Sciences<\/title>\n<meta name=\"description\" content=\"Discover how Symphoni\u2122 cut tooling by 90% and floor space by 50% while maintaining 320 ppm. Flexible, fast, and gentle. Read the case study now!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Assembly case study\" \/>\n<meta property=\"og:description\" content=\"Discover how Symphoni\u2122 cut tooling by 90% and floor space by 50% while maintaining 320 ppm. Flexible, fast, and gentle. Read the case study now!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/\" \/>\n<meta property=\"og:site_name\" content=\"ATS Life Sciences\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-23T13:31:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2024\/07\/site-preview-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/\",\"url\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/\",\"name\":\"Assembly case study - ATS Life Sciences\",\"isPartOf\":{\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/08\/Symphoni-Syringe-Bottom-Banner-2.png\",\"datePublished\":\"2023-05-11T19:00:30+00:00\",\"dateModified\":\"2025-09-23T13:31:45+00:00\",\"description\":\"Discover how Symphoni\u2122 cut tooling by 90% and floor space by 50% while maintaining 320 ppm. Flexible, fast, and gentle. Read the case study now!\",\"breadcrumb\":{\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/#primaryimage\",\"url\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/08\/Symphoni-Syringe-Bottom-Banner-2.png\",\"contentUrl\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/08\/Symphoni-Syringe-Bottom-Banner-2.png\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Assembly case study\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/#website\",\"url\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/\",\"name\":\"ATS Life Sciences\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Assembly case study - ATS Life Sciences","description":"Discover how Symphoni\u2122 cut tooling by 90% and floor space by 50% while maintaining 320 ppm. Flexible, fast, and gentle. Read the case study now!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/","og_locale":"en_US","og_type":"article","og_title":"Assembly case study","og_description":"Discover how Symphoni\u2122 cut tooling by 90% and floor space by 50% while maintaining 320 ppm. Flexible, fast, and gentle. Read the case study now!","og_url":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/","og_site_name":"ATS Life Sciences","article_modified_time":"2025-09-23T13:31:45+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2024\/07\/site-preview-2.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/","url":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/","name":"Assembly case study - ATS Life Sciences","isPartOf":{"@id":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/#primaryimage"},"image":{"@id":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/#primaryimage"},"thumbnailUrl":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/08\/Symphoni-Syringe-Bottom-Banner-2.png","datePublished":"2023-05-11T19:00:30+00:00","dateModified":"2025-09-23T13:31:45+00:00","description":"Discover how Symphoni\u2122 cut tooling by 90% and floor space by 50% while maintaining 320 ppm. Flexible, fast, and gentle. Read the case study now!","breadcrumb":{"@id":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/#primaryimage","url":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/08\/Symphoni-Syringe-Bottom-Banner-2.png","contentUrl":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-content\/uploads\/sites\/65\/2023\/08\/Symphoni-Syringe-Bottom-Banner-2.png","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/case-studies\/assembly-case-study\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/"},{"@type":"ListItem","position":2,"name":"Assembly case study"}]},{"@type":"WebSite","@id":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/#website","url":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/","name":"ATS Life Sciences","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-json\/wp\/v2\/case_study\/13042","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-json\/wp\/v2\/case_study"}],"about":[{"href":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-json\/wp\/v2\/types\/case_study"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-json\/wp\/v2\/media\/15025"}],"wp:attachment":[{"href":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-json\/wp\/v2\/media?parent=13042"}],"wp:term":[{"taxonomy":"case_study_category","embeddable":true,"href":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-json\/wp\/v2\/case_study_category?post=13042"},{"taxonomy":"case_study_tag","embeddable":true,"href":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-json\/wp\/v2\/case_study_tag?post=13042"},{"taxonomy":"resource_category","embeddable":true,"href":"https:\/\/ats-automation-develop.go-vip.net\/atsls2\/wp-json\/wp\/v2\/resource_category?post=13042"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}