{"id":824,"date":"2026-01-16T19:15:00","date_gmt":"2026-01-16T19:15:00","guid":{"rendered":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/?post_type=blog-posts&#038;p=824"},"modified":"2026-08-18T14:11:38","modified_gmt":"2026-08-18T14:11:38","slug":"modular-construction-nuclear","status":"publish","type":"blog-posts","link":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/","title":{"rendered":"Modular Construction in Nuclear: Why It Matters Now More Than Ever\u00a0"},"content":{"rendered":"<div class=\"gb-container gb-container-ce8bc8d1\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-43e0bf36\">\n<div class=\"gb-grid-column gb-grid-column-793f3cf0\"><div class=\"gb-container gb-container-793f3cf0\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-7a071ef4 gb-headline-text\">If you\u2019ve worked in the nuclear sector long enough, you\u2019ve seen a few so-called \u201crenaissances.\u201d Some came and went with little more than strategy documents and conference excitement. But this time feels different.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-86359619 gb-headline-text\"><em>Electrification, net-zero commitments, and\u2014more recently\u2014the explosive growth of AI data centres\u2014are reshaping electricity demand across the world. <\/em>According to a forecast from the Independent Electricity System Operator (IESO), electricity needs could rise by <a href=\"https:\/\/www.ieso.ca\/Corporate-IESO\/Media\/News-Releases\/2024\/10\/Electricity-Demand-in-Ontario-to-Grow-by-75-per-cent-by-2050\" target=\"_blank\" rel=\"noreferrer noopener\">75% by 2050 in Ontario<\/a> alone. And nuclear is front and center in meeting that challenge.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-f5b77252 gb-headline-text\">At the same time, we\u2019re heading into one of the busiest periods of nuclear construction the province of Ontario has ever seen. The <a href=\"https:\/\/www.opg.com\/projects-services\/projects\/nuclear\/darlington-refurbishment\/\" target=\"_blank\" rel=\"noreferrer noopener\">Darlington refurbishment project<\/a> is wrapping up, Bruce Power\u2019s massive <a href=\"https:\/\/www.brucepower.com\/life-extension-program-mcr-project\/\" target=\"_blank\" rel=\"noreferrer noopener\">MCR program<\/a> continues, planning is underway for the Pickering refurbishment project, and the first grid-connected <a href=\"https:\/\/www.opg.com\/projects-services\/projects\/nuclear\/smr\/darlington-smr\/\" target=\"_blank\" rel=\"noreferrer noopener\">Small Modular Reactor (SMR)<\/a> in the G7 is being built at Darlington. Add to that early planning for Bruce C and <a href=\"https:\/\/www.ontario.ca\/page\/energy-generations\" target=\"_blank\" rel=\"noreferrer noopener\">Wesleyville<\/a>\u2014representing up to <strong>17.8 GW<\/strong> of new capacity. <\/p>\n\n\n\n<p class=\"gb-headline gb-headline-96767d61 gb-headline-text\">With this current momentum, the question becomes, <em>how do we scale nuclear construction without overwhelming the workforce and the supply chain?<\/em><\/p>\n\n\n\n<p class=\"gb-headline gb-headline-02049523 gb-headline-text\">Past challenges in the nuclear industry largely stemmed from poor project planning and fragmented governance, leading to massive delays and cost overruns, compounded by rigid regulatory processes and supply chain gaps that stalled efficient growth. These issues created a <em>cycle of uncertainty and high capital risk, discouraging investment and slowing modernization efforts.<\/em><\/p>\n\n\n\n<p class=\"gb-headline gb-headline-bd9130a3 gb-headline-text\">Modern strategies\u2014such as design simplification, digital integration, modular construction, and robust supply chain partnerships\u2014directly address these historical inefficiencies. For example, SMR and automation-driven refurbishment programs, such as <a href=\"https:\/\/atsindustrialautomation.com\/news\/its-a-new-world-record-for-calandria-tube-removal\/\">Bruce Power\u2019s MCR project,<\/a> aim to replicate success factors from other industries to shorten timelines and reduce first-of-a-kind (FOAK) risk.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-a9f47b1f gb-headline-text\">Building on these modern strategies, a critical step is embracing <strong>modularization<\/strong>, which streamlines construction by enabling parallel work streams, reducing on-site complexity, and significantly shortening project timelines.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-1e77d957 gb-headline-text\">What Modular Construction Means in Nuclear Projects<\/h2>\n\n\n\n<p class=\"gb-headline gb-headline-988f7ae0 gb-headline-text\">Modular construction is not new. Other industries\u2014from high-rise buildings to aerospace\u2014adopted it decades ago. The nuclear industry has also successfully used it before in projects like:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>China\u2019s <strong>Qinshan CANDU units<\/strong> used modular techniques to hit unprecedented schedule milestones at the time.<\/li>\n\n\n\n<li>The <strong>AP1000<\/strong> was designed around modularization, with entire building sections and major equipment delivered as factory-built assemblies.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"gb-headline gb-headline-79c52c83 gb-headline-text\">So Why is Modularization Important? Here are Some of the Biggest Benefits:<\/h3>\n\n\n\n<p class=\"gb-headline gb-headline-714cf559 gb-headline-text\"><strong>1. More Work Done in the Factory<\/strong><\/p>\n\n\n\n<p class=\"gb-headline gb-headline-54a34960 gb-headline-text\">Factory environments offer better quality control, fewer weather issues, and reduced workforce bottlenecks than what is typically found at construction sites.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-3162b32a gb-headline-text\"><strong>2. Large \u201cOpen-Top\u201d Installs<\/strong><\/p>\n\n\n\n<p class=\"gb-headline gb-headline-f1b07510 gb-headline-text\">Big modules can be lowered directly into the plant using heavy-lift cranes, reducing on-site congestion.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-bf786974 gb-headline-text\"><strong>3. Earlier Design Maturity<\/strong><\/p>\n\n\n\n<p class=\"gb-headline gb-headline-a6dd723d gb-headline-text\">Modular construction forces major design decisions earlier, which helps reduce costly rework changes later.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-c7d7b1cc gb-headline-text\"><strong>4. Ability to Learn and Iterate<\/strong><\/p>\n\n\n\n<p class=\"gb-headline gb-headline-bda57fa9 gb-headline-text\">You can build mock-ups, test assemblies, and quickly refine designs with <a href=\"https:\/\/atsindustrialautomation.com\/pre-automation\/\">pre-automation tools<\/a> long before they ever reach the plant.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-a89e2b63 gb-headline-text\"><strong>5. Reduced Schedule Risk<\/strong><\/p>\n\n\n\n<p class=\"gb-headline gb-headline-7a56d42f gb-headline-text\">When civil work is delayed, manufacturing doesn\u2019t have to stop. Modules can continue being built off-site.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-15e468dd gb-headline-text\">For SMRs, modularization is even more essential. If SMRs are going to compete with options like liquefied natural gas (LNG) combined with carbon capture technologies, they must be:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Highly repeatable<\/li>\n\n\n\n<li>Easy to assemble<\/li>\n\n\n\n<li>Designed for lifecycle cost efficiency<\/li>\n<\/ul>\n\n\n\n<p class=\"gb-headline gb-headline-5f24a813 gb-headline-text\">Without modularization, SMRs simply won\u2019t hit the cost or schedule targets they\u2019re designed for.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-ae62e256 gb-headline-text\">Where Automation Fits In for Modular Construction in Nuclear<\/h2>\n\n\n\n<p class=\"gb-headline gb-headline-b5c3bc1f gb-headline-text\">Let\u2019s get one thing out of the way<strong>, <\/strong>automation isn\u2019t a magic wand.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-0b8c6144 gb-headline-text\">Not every process needs robots, and not every module will have the volume to justify it.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-22fb9190 gb-headline-text\">But the <em>thinking behind automation <\/em>\u2014 the discipline, the planning, the precision\u2014absolutely matters.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-54f4e548 gb-headline-text\">Modularization unlocks new efficiencies by shifting more work off-site and enabling parallel construction streams. <em>But to fully realize these benefits, automation must be woven into the modular build process. <\/em><a href=\"https:\/\/atsindustrialautomation.com\/blog-posts\/how-technology-is-helping-advance-the-smr-industry\/\">Automation<\/a> isn\u2019t just about robots\u2014it\u2019s about <em>applying disciplined, repeatable processes that maximize the advantages of factory-built modules.<\/em> When automation and modularization work together, manufacturers can achieve higher quality, tighter tolerances, and faster assembly, all while reducing on-site risks and bottlenecks.<\/p>\n\n\n<div class=\"gb-grid-wrapper gb-grid-wrapper-5ccd63ea\">\n<div class=\"gb-grid-column gb-grid-column-ca5b7846\"><div class=\"gb-container gb-container-ca5b7846\"><div class=\"gb-inside-container\">\n\n<p class=\"gb-headline gb-headline-7c785d12 gb-headline-text\">Before a manufacturer automates anything, they collaborate with an automation partner who walks them through strategic <a href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/pre-automation\/\" type=\"page\" id=\"552\">pre-automation<\/a> steps such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Defining requirements<\/li>\n\n\n\n<li><a href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/pre-automation\/design-for-manufacturability\/\" type=\"page\" id=\"652\">DFMA<\/a> (Design for Manufacturing and Assembly) reviews<\/li>\n\n\n\n<li>Process simulations<\/li>\n\n\n\n<li><a href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/pre-automation\/proof-of-principle-studies\/\" type=\"page\" id=\"828\">Proof-of-principle tests<\/a><\/li>\n\n\n\n<li>Tolerance stack-ups<\/li>\n\n\n\n<li>Prototype builds<\/li>\n\n\n\n<li><a href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/pre-automation\/validation-planning\/\" type=\"page\" id=\"951\">Validation plans<\/a><\/li>\n<\/ul>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-86020bf0\"><div class=\"gb-container gb-container-86020bf0\"><div class=\"gb-inside-container\">\n\n<figure class=\"gb-block-image gb-block-image-90feb6b2\"><img decoding=\"async\" loading=\"lazy\" width=\"980\" height=\"653\" class=\"gb-image gb-image-90feb6b2\" src=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling.png\" alt=\"ATS Employees working on nuclear reactor automation and tooling equipment\" title=\"Nuclear Tooling\" srcset=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling.png 980w, https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling.png?resize=300,200 300w, https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling.png?resize=768,512 768w\" sizes=\"auto, (max-width: 980px) 100vw, 980px\" \/>\n<figcaption class=\"gb-headline gb-headline-6badf1bf gb-headline-text\"><\/figcaption>\n<\/figure>\n\n<\/div><\/div><\/div>\n<\/div>\n\n\n<p class=\"gb-headline gb-headline-b1d2455d gb-headline-text\">These steps drastically improve manufacturability\u2014whether or not&nbsp;automated tooling is ever involved.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-b132842d gb-headline-text\">Why Automation Discipline Matters for Nuclear Projects<\/h2>\n\n\n\n<p class=\"gb-headline gb-headline-4a8931bd gb-headline-text\">In nuclear, even minor design tweaks can have major regulatory implications. That means you need to design assemblies that:<\/p>\n\n\n<div class=\"gb-grid-wrapper gb-grid-wrapper-a8756779\">\n<div class=\"gb-grid-column gb-grid-column-350e90d5\"><div class=\"gb-container gb-container-350e90d5\"><div class=\"gb-inside-container\">\n\n<figure class=\"gb-block-image gb-block-image-77ab6cdf\"><img decoding=\"async\" loading=\"lazy\" width=\"980\" height=\"653\" class=\"gb-image gb-image-77ab6cdf\" src=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/01\/Team-Meeting.png\" alt=\"\" title=\"Team Meeting\" srcset=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/01\/Team-Meeting.png 980w, https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/01\/Team-Meeting.png?resize=300,200 300w, https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/01\/Team-Meeting.png?resize=768,512 768w\" sizes=\"auto, (max-width: 980px) 100vw, 980px\" \/>\n<figcaption class=\"gb-headline gb-headline-dadd9a7b gb-headline-text\"><\/figcaption>\n<\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-1f526833\"><div class=\"gb-container gb-container-1f526833\"><div class=\"gb-inside-container\">\n\n<ul class=\"wp-block-list\">\n<li>Use fewer parts<\/li>\n\n\n\n<li>Are easy to orient and access<\/li>\n\n\n\n<li>Avoid unnecessary fasteners<\/li>\n\n\n\n<li>Allow clean access for inspection and testing<\/li>\n\n\n\n<li>Tolerance stack-ups<\/li>\n\n\n\n<li>Fit within precise tolerances<\/li>\n\n\n\n<li>Can be reliably reproduced across a fleet<\/li>\n<\/ul>\n\n\n\n<p class=\"gb-headline gb-headline-f9d125c4 gb-headline-text\">Automation thinking is what helps teams anticipate potential issues early and avoid expensive changes later.<\/p>\n\n<\/div><\/div><\/div>\n<\/div>\n\n\n<p class=\"gb-headline gb-headline-02746e46 gb-headline-text\">In a modular nuclear project, automation supports everything from precision welding and robotic assembly of module components to automated inspection and testing. By integrating automation into the factory environment, teams can simulate and validate processes before modules ever reach the site, ensuring that each unit meets exacting standards and regulatory requirements. This synergy between modularization and automation is what allows nuclear projects to scale up efficiently, even as demand surges.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-a5b00d85 gb-headline-text\">Key Advice for Today\u2019s Nuclear Industry<\/h2>\n\n\n\n<p class=\"gb-headline gb-headline-fe7a71bc gb-headline-text\">With demand for clean, reliable power rising faster than ever, today\u2019s nuclear providers face both unprecedented opportunity and pressure to deliver. The strategies outlined above\u2014modularization, automation, and early collaboration\u2014aren\u2019t just theoretical best practices; they\u2019re essential tools for meeting the scale and speed required in this new era.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-02981c20 gb-headline-text\">More talent is arriving from automotive, aerospace, heavy industry, and advanced manufacturing sectors. That\u2019s a good thing. These people bring new perspectives\u2014and they expect better tools and better processes. All elements which are key to our current nuclear renaissance.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-a18f872a gb-headline-text\">Whether you\u2019re a reactor vendor, an equipment supplier, or a construction partner, the following actions can help you\u2014and the industry\u2014rise to the challenge:<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-c64f37c7 gb-headline-text\">1. Involve Manufacturers Early<\/h3>\n\n\n\n<p class=\"gb-headline gb-headline-bc87d023 gb-headline-text\">Bring fabricators into the design process. Early <a href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/pre-automation\/design-for-manufacturability\/\" type=\"page\" id=\"652\">DFMA reviews<\/a> save months of rework.<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-3b225772 gb-headline-text\">2. Don\u2019t Reject Automation Too Quickly<\/h3>\n\n\n\n<p class=\"gb-headline gb-headline-d755c2a2 gb-headline-text\">Even if volumes are low, tooling, fixtures, and process planning can make huge differences.<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-9162f610 gb-headline-text\">3. Standardize Everything You Can<\/h3>\n\n\n\n<p class=\"gb-headline gb-headline-619d7dad gb-headline-text\">Shared parts, shared fasteners, shared interfaces \u2014 these things multiply efficiency across a fleet.<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-08ad9dd9 gb-headline-text\">4. Think About the Entire Plant Lifecycle<\/h3>\n\n\n\n<p class=\"gb-headline gb-headline-97e5cf2d gb-headline-text\">The tooling you design for a new build can also help with operations, maintenance, and eventually decommissioning.<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-ec84dcfb gb-headline-text\">5. Use Digital Tools Beyond Just the Plant Design<\/h3>\n\n\n\n<p class=\"gb-headline gb-headline-14719300 gb-headline-text\">Digital twins and virtual factory simulations can identify problems long before construction begins.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-8f6b34c6 gb-headline-text\">Final Thoughts on Modular Construction in Nuclear<\/h2>\n\n\n\n<p class=\"gb-headline gb-headline-22998ab7 gb-headline-text\">The nuclear industry is entering a moment unlike anything we\u2019ve seen in decades. The need is massive, the timelines are long, and the number of projects is growing fast. To succeed, we need to build smarter.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-cc71fd77 gb-headline-text\">Modular construction, paired with <a href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/en\/sectors\/smr\/\" type=\"page\" id=\"1150\">strong tooling and selective automation<\/a>, is one of the clearest pathways to delivering nuclear projects faster, safer, and at a scale that matches what the future requires.<\/p>\n\n\n\n<p class=\"gb-headline gb-headline-ba00ae62 gb-headline-text\">If the industry gets this right, we won\u2019t just build more reactors\u2014we&#8217;ll build them better.<\/p>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-3313c110\"><div class=\"gb-container gb-container-3313c110 ia-sticky top\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-5b5d2cbf ia-sticky top\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-6c3c752b\"><div class=\"gb-inside-container\">\n\n<h3 class=\"gb-headline gb-headline-7ddda662 gb-headline-text h5\">Speak to a nuclear expert to learn how automated solutions can enhance the design and build of your project.<\/h3>\n\n\n\n<iframe title=\"Get in touch\" allow=\"local-network-access\" id=\"pardot-form-iframe\" style=\"border: 0; width: 100%; height: 650px;\" src=\"https:\/\/go.atsautomation.com\/l\/651873\/2026-06-26\/h8p4lm?Source_Page=NUC-Blog-Modular-Construction\" frameborder=\"0\">\n<\/iframe>\n\n<script type=\"text\/javascript\">\n    var pardot_iframe = document.getElementById('pardot-form-iframe');\n\n    if (window.location.search) {\n        pardot_iframe.src = pardot_iframe.src + '&' + window.location.search.substr(1);\n    }\n<\/script>\n\n<script>\n    window.addEventListener('message', function(event) {\n        if (event.data.type === 'customFormRedirect' && event.data.url) {\n            window.location.href = event.data.url;\n        }\n    });\n<\/script>\n\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-17a528a3\"><div class=\"gb-inside-container\">\n\t<div class=\"post-author post-author--has-media\">\n\t\t\t\t\t<div class=\"post-author__media\">\n\t\t\t\t<img decoding=\"async\" width=\"521\" height=\"558\" src=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Majid-Afana-2.png?w=521\" class=\"post-author__img\" alt=\"Majid Afana\" loading=\"lazy\" srcset=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Majid-Afana-2.png 521w, https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Majid-Afana-2.png?resize=280,300 280w\" sizes=\"auto, (max-width: 521px) 100vw, 521px\" \/>\t\t\t<\/div>\n\t\t\n\t\t<div class=\"post-author__body\">\n\t\t\t\t\t\t\t<div class=\"post-author__avatar\">\n\t\t\t\t\t<img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Majid-Afana-2.png?w=150&amp;h=150&amp;crop=1\" class=\"post-author__avatar-img\" alt=\"Majid Afana\" loading=\"lazy\" \/>\t\t\t\t<\/div>\n\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t<a class=\"post-author__name\" href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/authors\/majid-afana\/\">\n\t\t\t\t\t\tMajid Afana\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<p class=\"post-author__role\">Global Director, Nuclear Business Development &amp; Sales <\/p>\n\t\t\t\n\t\t\t\t\t\t\t<div class=\"post-author__bio\">Bringing over 12 years of experience in the nuclear industry, with a strong foundation in mechanical engineering, business development, and operations. Majid helps customers execute growth strategies and develop tailored automation solutions across the nuclear lifecycle, driving innovation and long-term value. <\/div>\n\t\t\t\t\t<\/div>\n\t<\/div>\n\t\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-3862701a\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-4a3031d2\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-7a26eb52\">\n<div class=\"gb-grid-column gb-grid-column-855ffe27\"><div class=\"gb-container gb-container-855ffe27\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-8d831f06 gb-headline-text\">Resources<\/h2>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-cabda9e8\"><div class=\"gb-container gb-container-cabda9e8\"><div class=\"gb-inside-container\">\n<div class=\"gb-button-wrapper gb-button-wrapper-8560cd9e\">\n\n<a class=\"gb-button gb-button-11a5ccbb gb-button-text link-main\" href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/resources\/\">View all<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n\n\n<section id=\"featured-posts-block_0feaf2271ad5367924695a1c01d36937\" class=\"featured-posts featured-posts--accent\">\n\t<div class=\"featured-posts__inner\">\n\t\t<div class=\"featured-posts__list\">\n\t\t\t\t\t\t\t\t\t\t\t<a class=\"featured-posts__card featured-posts__card--side\" href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/reliability-engineering-nuclear-requires-different-standard\/\">\n\t\t\t\t\t\t\t\t\t\t\t<figure class=\"featured-posts__media\">\n\t\t\t\t\t\t\t<img\n\t\t\t\t\t\t\t\tclass=\"featured-posts__image\"\n\t\t\t\t\t\t\t\tsrc=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling-Equipment.png?w=980\"\n\t\t\t\t\t\t\t\talt=\"ATS employee working on nuclear tooling\"\n\t\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"featured-posts__body\">\n\t\t\t\t\t\t<h4 class=\"featured-posts__title\">\n\t\t\t\t\t\t\tWhy Reliability Engineering in Nuclear Requires a Different Standard\t\t\t\t\t\t<\/h3>\n\n\t\t\t\t\t\t<span class=\"featured-posts__link link-main\">\n\t\t\t\t\t\t\tLearn More\t\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t<a class=\"featured-posts__card featured-posts__card--accent\" href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/net-zero-future\/\">\n\t\t\t\t\t\t\t\t\t\t\t<figure class=\"featured-posts__media\">\n\t\t\t\t\t\t\t<img\n\t\t\t\t\t\t\t\tclass=\"featured-posts__image\"\n\t\t\t\t\t\t\t\tsrc=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/08\/Nuclear-Facility.png?w=980\"\n\t\t\t\t\t\t\t\talt=\"Nuclear Team Working on Equipment\"\n\t\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"featured-posts__body\">\n\t\t\t\t\t\t<h4 class=\"featured-posts__title\">\n\t\t\t\t\t\t\tNuclear Energy Is Not Optional for Canada\u2019s Net\u2011Zero Future\t\t\t\t\t\t<\/h3>\n\n\t\t\t\t\t\t<span class=\"featured-posts__link link-main\">\n\t\t\t\t\t\t\tLearn More\t\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t<a class=\"featured-posts__card featured-posts__card--side\" href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/nuclear-decommissioning-reducing-cost-and-risk-with-advanced-tooling\/\">\n\t\t\t\t\t\t\t\t\t\t\t<figure class=\"featured-posts__media\">\n\t\t\t\t\t\t\t<img\n\t\t\t\t\t\t\t\tclass=\"featured-posts__image\"\n\t\t\t\t\t\t\t\tsrc=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/08\/Nuclear-decommissioning-automated-tooling.png?w=980\"\n\t\t\t\t\t\t\t\talt=\"Nuclear decommissioning automated tooling\"\n\t\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"featured-posts__body\">\n\t\t\t\t\t\t<h4 class=\"featured-posts__title\">\n\t\t\t\t\t\t\tNuclear Decommissioning \u2013 Reducing Cost and Risk With Advanced Tooling\t\t\t\t\t\t<\/h3>\n\n\t\t\t\t\t\t<span class=\"featured-posts__link link-main\">\n\t\t\t\t\t\t\tLearn More\t\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/a>\n\t\t\t\t\t<\/div>\n\t<\/div>\n<\/section>\n\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Discover why modular construction is critical for nuclear projects. Learn how it accelerates timelines, reduces risk, and supports SMR deployment.  [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/\">Read More&#8230;<span class=\"screen-reader-text\"> from Modular Construction in Nuclear: Why It Matters Now More Than Ever\u00a0<\/span><\/a><\/p>\n","protected":false},"featured_media":556,"template":"","blog_posts_categories":[16],"class_list":["post-824","blog-posts","type-blog-posts","status-publish","has-post-thumbnail","hentry","blog_posts_categories-smr"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.8 (Yoast SEO v26.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Modular Construction in Nuclear: Why It Matters Now More Than Ever\u00a0 | ATS Nuclear Energy Solutions<\/title>\n<meta name=\"description\" content=\"Discover why modular construction is critical for nuclear projects. Learn how it accelerates timelines, reduces risk, and supports SMR deployment.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Modular Construction in Nuclear: Why It Matters Now More Than Ever\u00a0\" \/>\n<meta property=\"og:description\" content=\"Discover why modular construction is critical for nuclear projects. Learn how it accelerates timelines, reduces risk, and supports SMR deployment.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/\" \/>\n<meta property=\"og:site_name\" content=\"ATS Nuclear Energy Solutions\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-18T14:11:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling.png\" \/>\n\t<meta property=\"og:image:width\" content=\"980\" \/>\n\t<meta property=\"og:image:height\" content=\"653\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/\",\"url\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/\",\"name\":\"Modular Construction in Nuclear: Why It Matters Now More Than Ever\u00a0 | ATS Nuclear Energy Solutions\",\"isPartOf\":{\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling.png\",\"datePublished\":\"2026-01-16T19:15:00+00:00\",\"dateModified\":\"2026-08-18T14:11:38+00:00\",\"description\":\"Discover why modular construction is critical for nuclear projects. Learn how it accelerates timelines, reduces risk, and supports SMR deployment.\",\"breadcrumb\":{\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/#primaryimage\",\"url\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling.png\",\"contentUrl\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling.png\",\"width\":980,\"height\":653,\"caption\":\"ATS Employees working on nuclear reactor automation and tooling equipment\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Blog Posts\",\"item\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Modular Construction in Nuclear: Why It Matters Now More Than Ever\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/#website\",\"url\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/\",\"name\":\"ATS Nuclear Energy Solutions\",\"description\":\"\",\"alternateName\":\"ATS Nuclear Energy Solutions\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Modular Construction in Nuclear: Why It Matters Now More Than Ever\u00a0 | ATS Nuclear Energy Solutions","description":"Discover why modular construction is critical for nuclear projects. Learn how it accelerates timelines, reduces risk, and supports SMR deployment.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/","og_locale":"en_US","og_type":"article","og_title":"Modular Construction in Nuclear: Why It Matters Now More Than Ever\u00a0","og_description":"Discover why modular construction is critical for nuclear projects. Learn how it accelerates timelines, reduces risk, and supports SMR deployment.","og_url":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/","og_site_name":"ATS Nuclear Energy Solutions","article_modified_time":"2026-08-18T14:11:38+00:00","og_image":[{"width":980,"height":653,"url":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/","url":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/","name":"Modular Construction in Nuclear: Why It Matters Now More Than Ever\u00a0 | ATS Nuclear Energy Solutions","isPartOf":{"@id":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/#primaryimage"},"image":{"@id":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/#primaryimage"},"thumbnailUrl":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling.png","datePublished":"2026-01-16T19:15:00+00:00","dateModified":"2026-08-18T14:11:38+00:00","description":"Discover why modular construction is critical for nuclear projects. Learn how it accelerates timelines, reduces risk, and supports SMR deployment.","breadcrumb":{"@id":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/#primaryimage","url":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling.png","contentUrl":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-content\/uploads\/sites\/75\/2026\/07\/Nuclear-Tooling.png","width":980,"height":653,"caption":"ATS Employees working on nuclear reactor automation and tooling equipment"},{"@type":"BreadcrumbList","@id":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/modular-construction-nuclear\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/"},{"@type":"ListItem","position":2,"name":"Blog Posts","item":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/blog-posts\/"},{"@type":"ListItem","position":3,"name":"Modular Construction in Nuclear: Why It Matters Now More Than Ever\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/#website","url":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/","name":"ATS Nuclear Energy Solutions","description":"","alternateName":"ATS Nuclear Energy Solutions","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-json\/wp\/v2\/blog-posts\/824","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-json\/wp\/v2\/blog-posts"}],"about":[{"href":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-json\/wp\/v2\/types\/blog-posts"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-json\/wp\/v2\/media\/556"}],"wp:attachment":[{"href":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-json\/wp\/v2\/media?parent=824"}],"wp:term":[{"taxonomy":"blog_posts_categories","embeddable":true,"href":"https:\/\/ats-automation-develop.go-vip.net\/atsianuclear\/wp-json\/wp\/v2\/blog_posts_categories?post=824"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}